Attach the to the back of the Base Frame using the designated long hex bolts, washers, and locknuts.
Take your time, lay out all parts on a clean floor, and treat the assembly as a weekend project. When you finally perform that first smooth lat pulldown on your fully assembled Pacific Fitness Del Mar, you will understand why this machine earned its reputation. And if you still need help, the online home gym community is always ready to share a scanned manual page.
Start at the lat pulldown station. Run the cable over the top pulleys of the upper cross beam, down into the weight stack tower, and connect it directly to the top of the selector rod.
Wipe down the vinyl upholstery after your workout with a damp cloth and mild soap to prevent sweat corrosion.
Always remember that "left" and "right" on the machine are based on a person sitting in the main seat facing the arm press . If you'd like, I can: Help you locate a specific part Find a link to a similar assembly video Give you tips on how to properly tighten the cables Let me know which of these you'd like to do! Fitness Gear Assembly DIY Step By Step Guide
: Allocate a minimum footprint of 8 feet by 7 feet to allow for full range of motion on the press arm and optional leg press.
Mount the main post using carriage bolts and stabilizing plates.
Install all pulleys with bolts and spacers. Run cables through pulleys, add cable ends (ball stops or threaded studs). Leave slight slack for initial adjustment.
Attach the to the front base pivot point, ensuring the pivot sleeve moves smoothly.
Attach the butterfly and bench press arm pieces using the provided rods, bolts, and nuts.
Lift the central vertical frame post onto the base plate. Align the bolt holes at the bottom. Secure it using the specified hex bolts.
Ensure the steel aircraft cable travels in a perfectly straight line from one pulley to the next without twisting around the frame.
Cable routing is the most critical and complex part of assembling the Pacific Fitness Del Mar. Incorrect routing results in a scraping sensation, uneven weight resistance, or snapped cables.
Go back through the entire machine and fully tighten all nuts and bolts. Ensure nylon locknuts are fully engaged.
Attach the to the front of the Base Frame.
Attach the to the back of the Base Frame using the designated long hex bolts, washers, and locknuts.
Take your time, lay out all parts on a clean floor, and treat the assembly as a weekend project. When you finally perform that first smooth lat pulldown on your fully assembled Pacific Fitness Del Mar, you will understand why this machine earned its reputation. And if you still need help, the online home gym community is always ready to share a scanned manual page.
Start at the lat pulldown station. Run the cable over the top pulleys of the upper cross beam, down into the weight stack tower, and connect it directly to the top of the selector rod.
Wipe down the vinyl upholstery after your workout with a damp cloth and mild soap to prevent sweat corrosion. pacific fitness del mar home gym assembly manual
Always remember that "left" and "right" on the machine are based on a person sitting in the main seat facing the arm press . If you'd like, I can: Help you locate a specific part Find a link to a similar assembly video Give you tips on how to properly tighten the cables Let me know which of these you'd like to do! Fitness Gear Assembly DIY Step By Step Guide
: Allocate a minimum footprint of 8 feet by 7 feet to allow for full range of motion on the press arm and optional leg press.
Mount the main post using carriage bolts and stabilizing plates. Attach the to the back of the Base
Install all pulleys with bolts and spacers. Run cables through pulleys, add cable ends (ball stops or threaded studs). Leave slight slack for initial adjustment.
Attach the to the front base pivot point, ensuring the pivot sleeve moves smoothly.
Attach the butterfly and bench press arm pieces using the provided rods, bolts, and nuts. And if you still need help, the online
Lift the central vertical frame post onto the base plate. Align the bolt holes at the bottom. Secure it using the specified hex bolts.
Ensure the steel aircraft cable travels in a perfectly straight line from one pulley to the next without twisting around the frame.
Cable routing is the most critical and complex part of assembling the Pacific Fitness Del Mar. Incorrect routing results in a scraping sensation, uneven weight resistance, or snapped cables.
Go back through the entire machine and fully tighten all nuts and bolts. Ensure nylon locknuts are fully engaged.
Attach the to the front of the Base Frame.